Every breaker in a distribution box carries two ratings that buyers routinely under-specify: Icu, the ultimate short-circuit breaking capacity, and Ics, the capacity after which the breaker can stay in service. Both must exceed the prospective fault current at the point of installation — not at the transformer. This guide explains the IEC 60947-2 test sequences behind each rating and walks an IEC 60909-0 fault calculation from transformer to box terminals.

What Icu and Ics Actually Prove
Under IEC 60947-2, the two ratings are proven by different test sequences:
- Icu — ultimate breaking capacity. Sequence O–t–CO (open, delay, close-open). The breaker must interrupt the fault current; the standard does not require it to remain fully serviceable afterwards. A breaker that clears at Icu may end its life doing so.
- Ics — service breaking capacity. Sequence O–t–CO–t–CO (a second interruption follows). Afterwards the breaker must still carry rated current and pass functional checks. Ics is declared as a percentage of Icu — commonly 50%, 75% or 100% in today’s MCCB and ACB catalogues.
- Icm — making capacity. The peak current the breaker can close onto. First peaks are roughly 2.0–2.2× the RMS symmetrical value at typical LV fault levels (the n factor tabulated in IEC 60947-2 against test power factor).
- Rated conditional short-circuit current. The fault level a lower-rated breaker can withstand when a specified upstream device clears the fault — the basis of cascade (backup) combinations published and tested by manufacturers.
At the box level, remember that the assembly has its own ratings under IEC 61439-3 / IEC 61439-1: short-time withstand Icw, peak Ipk, or a rated conditional short-circuit current. The breakers inside a box cannot rescue an assembly whose busbars are underrated — and vice versa.
Comparison: The Four Ratings You Will See on Nameplates
| Rating | Standard | Proves | Specified against |
|---|---|---|---|
| Icu | IEC 60947-2 (breakers) | Ultimate interruption; breaker need not stay serviceable | Prospective fault current at the breaker’s point of installation |
| Ics | IEC 60947-2 | Interruption with the breaker remaining serviceable | Continuity-critical circuits where rapid return to service matters |
| Icw / Ipk | IEC 61439-1/-3 (assemblies) | Busbar and structure withstand for a declared time / peak | Fault current and clearing time at the assembly |
| Conditional short-circuit current | IEC 60947-2 / 61439-1 | Withstand when a declared upstream device clears the fault | Cascade schemes using manufacturer-published combinations |
Calculating the Prospective Fault Current per IEC 60909-0
The three-phase initial symmetrical short-circuit current is:
Ik″ = c · Un / (√3 · Zk)
where c is the voltage factor from IEC 60909-0 Table 1 (for 400 V LV networks, c = 1.05 for minimum calculations and up to 1.10 for maximum fault current at the transformer LV terminals), Un is the nominal line-to-line voltage, and Zk is the equivalent impedance to the fault point. Building Zk:
- Source impedance (transformer): Zt ≈ (uk / 100) · Un² / Sn, using the transformer’s rated short-circuit voltage uk% and rating Sn.
- Cable impedance: adds R (rising with conductor temperature at fault conditions) and X per metre — this is what makes the fault current at a remote distribution box far lower than at the main board.
- Motor contribution: running LV motors feed back into the fault during the first cycles; near motor control centers add the contribution per IEC 60909-3 rather than ignoring it.
Worked Example (Illustrative Method)
The figures below demonstrate the method only. Always design from your actual network data, manufacturer data and project specification.
- Source: 630 kVA transformer, uk = 6%, 400 V → Zt ≈ 0.06 × 400² / 630 000 ≈ 15.2 mΩ → at the main board, Ik″ ≈ 1.05 × 400 / (1.732 × 0.0152) ≈ 16 kA.
- Feed to a workshop distribution box: 30 m of 95 mm² copper per phase, R ≈ 7.2 mΩ and X ≈ 2.4 mΩ over the run (fault-temperature resistance) → Zk ≈ 15.2 mΩ + 7.6 mΩ ≈ 22.8 mΩ.
- At the box terminals: Ik″ ≈ 1.05 × 400 / (1.732 × 0.0228) ≈ 10.6 kA — about a third lower than the main board figure purely because of the cable.
- Selection: the box main breaker needs Icu ≥ 10.6 kA at the box — a 25 kA Icu MCCB leaves margin for network growth; outgoing MCBs of 10 kA Icu alone would be short at the box incomer, but become viable where the manufacturer’s tested cascade combination with the upstream MCCB covers the conditional rating.
Two habits follow: state the calculation point (main board vs box terminals), and take Icu at the maximum network configuration — transformer growth, parallel transformer operation, or a standby generator with higher fault contribution can move the number between design and year five.
Application Scenario and Case Analysis
Scenario: Workshop distribution box at the end of a 30 m feed
Site constraints. A maintenance workshop distribution box feeds local machines, lighting and socket circuits. The 30 m cable from the main board exists and is fixed; workshop output will grow with a planned press; downtime tolerance is low because the workshop supports a continuous production hall.
Selection reasoning. The fault calculation above gives ≈ 10.6 kA at the box. The incomer is an MCCB with Icu ≥ 15–25 kA (covering future network changes), and a declared Ics of 50% of Icu or higher so the incomer can be returned to service after clearing a fault rather than replaced. Outgoing breakers follow the manufacturer’s tested cascade tables against the declared upstream device; the assembly’s own nameplate under IEC 61439-3 shows a rated conditional short-circuit current consistent with that combination. Discrimination is checked so a machine fault trips its local breaker, not the incomer.
Common mistakes. (1) Sizing Icu to the transformer figure from a datasheet without subtracting the cable impedance — over-buying — or assuming the transformer figure applies at the box and under-buying when the cable is short and thick. (2) Treating Ics as marketing noise on continuity-critical incomers. (3) Ignoring motor contribution near machine groups. (4) Applying a cascade combination the manufacturer never tested — the conditional rating is only valid for the published pair. (5) Forgetting that the box assembly’s own short-circuit rating (Icw/Ipk or conditional) must match the same fault level.
Acceptance points. Match nameplate Icu/Ics of the delivered breakers to the specification schedule; check the assembly nameplate’s short-circuit rating under IEC 61439-3; record the fault calculation in the commissioning file with its assumptions; verify breaker torque and busbar connections; test the discrimination settings where adjustable trip units are used.
Selection Checklist
- Calculate Ik″ at each breaker location per IEC 60909-0 — main board, sub-main boxes, final boxes.
- Select Icu with margin for network growth; declare Ics requirements for breakers that must return to service.
- Use only manufacturer-tested cascade combinations for lower-rated downstream breakers.
- Match the assembly’s short-circuit rating under IEC 61439-3 to the same fault level.
- Record calculation assumptions (c factor, temperatures, motor contribution) in the project file.
Quality Inspection Points
- Nameplate Icu/Ics of delivered breakers matches the specification schedule.
- Assembly nameplate under IEC 61439-3 shows a short-circuit rating appropriate to the installation point.
- Torque marks on incomer and outgoing terminations; busbar joints undisturbed.
- Where cascade is used, the installed upstream device is exactly the tested model.
Supplier Audit Checklist
- Ask for the IEC 60947-2 test certificates covering the Icu/Ics values claimed for the breaker range at your voltage.
- Ask for the published cascade tables — not a verbal assurance — before relying on conditional ratings.
- Ask how the distribution box assembly’s short-circuit rating was verified: type test, or rated conditional with a named upstream device.
- Confirm spare-part availability for the incomer model, since a fault at Ics should mean reset, not replacement.
FAQ
- What is the difference between Icu and Ics? Icu is the ultimate rating proven by an O–t–CO sequence; Ics is proven by O–t–CO–t–CO and means the breaker remains serviceable afterwards.
- Is Ics a legal requirement? IEC 60947-2 requires the value to be declared; the percentage you need is an engineering decision driven by continuity requirements.
- Can downstream MCBs have lower Icu than the calculated fault? Only inside a manufacturer’s tested cascade combination with a declared upstream device — the conditional short-circuit current then covers the difference.
- Do I calculate at the transformer or at the box? At each breaker’s own installation point; cable impedance between them typically reduces the fault current by tens of percent.
- What c factor does IEC 60909-0 use at 400 V? 1.05 for minimum and 1.10 for maximum fault-current calculations at the LV transformer terminals; use the maximum when selecting breaking capacity.
- Does a standby generator change the numbers? It can — generator fault contribution and impedance differ from the mains source, and parallel operation raises the total; recalculate per IEC 60909.
- Does the enclosure’s own rating matter if the breakers are fine? Yes — the assembly’s busbars and structure must also be rated for the fault level under IEC 61439-3, and a cascade is only complete when both device and assembly ratings are consistent.
Size Breaking Capacity to the Point of Installation, Not the Brochure
BANGE Electric manufactures distribution boxes and distribution boards verified under IEC 61439-3, populated with breakers selected against calculated fault levels and documented cascade data. If your next box specification needs breaking capacities that hold up on paper and on site, review the distribution box product pages or contact the BANGE engineering team with your single-line diagram and fault calculation.
Requirements may vary by application, market, and applicable standard.